metricsign
Start free
Medium severitydata format

Power BI Refresh Error:
22007

What does this error mean?

A date/time string could not be parsed into the expected timestamp or date format.

Common causes

  • 1Source data uses a non-standard date format (e.g., MM/DD/YYYY instead of ISO 8601)
  • 2Timezone abbreviation in the string is not recognized by PostgreSQL
  • 3NULL or empty string being cast to a timestamp column
  • 4Data from a different locale using locale-specific date separators

How to fix it

  1. 1Step 1: Identify the failing value using `EXPLAIN` or pipeline error logs.
  2. 2Step 2: Use `TO_TIMESTAMP()` with an explicit format mask instead of implicit casting.
  3. 3Step 3: Normalize dates to ISO 8601 format (YYYY-MM-DD) in the ETL transformation layer.
  4. 4Step 4: Set `DateStyle` in `postgresql.conf` or per-session to match the source format.

Frequently asked questions

How do I prevent 22007 errors in automated pipelines?

Add retry logic with exponential backoff, validate data quality before loading, and monitor pipeline failures in MetricSign to catch this error early.

Official documentation: https://www.postgresql.org/docs/current/errcodes-appendix.html

Other data format errors